THE 6G DELIVERY PROCESS

Good energy starts
before installation.

A reliable solar system is the result of hundreds of small decisions made in the right order. 6G moves from site intelligence to engineering, disciplined execution and measured commissioning — so the finished system is designed around how the building actually uses power.

Solar installation engineered by a professional energy team
FROM FIRST VISIT TO LIVE DATAOne connected engineering process.
01
SITE INTELLIGENCE

Survey the
real site.

Before equipment is selected, we establish the physical and electrical reality of the property. The aim is to remove assumptions early.

Residential rooftop solar site survey

What we examine

The survey connects roof conditions, electrical infrastructure and actual energy behaviour before a system size is proposed.

Roof dimensions and usable zonesShade, orientation and obstructionsMeter, sanctioned load and phasesMain DB and critical circuitsMonthly and daytime consumptionBackup and future-load priorities
WHAT COMES OUT OF THIS STAGE
  • Measured site conditions and photo record
  • Initial energy and roof-capacity constraints
  • Clear inputs for engineering rather than guesswork
02
SYSTEM DESIGN

Engineer the
whole loop.

Panels are only one layer. We design the array, structure, inverter, protection, storage and monitoring as one electrical system.

Solar system engineering and planning

Engineering decisions

Every major component is selected against site conditions, operating goals and the way the system will behave under normal and backup conditions.

PV capacity and panel layoutString configuration and MPPT allocationInverter topology and headroomBattery capacity where requiredDC/AC protection and isolationStructure, earthing and cable routes
WHAT COMES OUT OF THIS STAGE
  • System architecture matched to the site
  • Equipment and protection strategy
  • Installation plan the site team can execute cleanly
03
INSTALLATION

Build it
as designed.

Execution is where good engineering can be lost. We focus on mechanical quality, cable discipline, protection and a clean finish that can be serviced later.

Commercial rooftop solar installation

What happens on site

The installation team follows the engineered layout and verifies critical details as the system is assembled.

Structure setting and alignmentModule mounting and string routingDC and AC cable managementEarthing and surge protectionInverter, battery and DB installationLabelling, access and housekeeping
WHAT COMES OUT OF THIS STAGE
  • Installed system aligned with the design
  • Accessible, labelled and serviceable electrical work
  • Site ready for full commissioning tests
04
LIVE POWER

Test. Tune.
Hand over.

A system is not finished when the last panel is mounted. We verify protections, operating behaviour, monitoring and the real handover experience.

Solar energy system commissioning and live operation

Commissioning checks

We test the system as an operating energy asset, not simply as installed hardware.

String and electrical verificationProtection and isolation checksInverter configurationBattery and backup behaviourMonitoring and communicationsCustomer handover and baseline data
WHAT COMES OUT OF THIS STAGE
  • Verified generation and operating behaviour
  • Live monitoring and visibility from day one
  • A system the owner understands how to use
/ WHY THE PROCESS MATTERS

The equipment matters.
The integration matters more.

Two systems with similar panels and inverters can perform very differently when the roof, load profile, protections, cable design, storage logic or commissioning are handled differently. Our process is built to make those decisions visible before they become problems.

01Measure before sizing
02Design before buying
03Build to the design
04Verify before handover

Start with your site.

Share your electricity use and property details, or ask the 6G team to review your project directly.

Talk to 6G
Talk to 6G AIWhatsApp